PROJECT INFO
Building type:
Offices
Year:
2014
Project Status:
Built
Gross Area:
37132 Sqft
Certificates:
LEED v3 BD+C (New Construction) Silver
Climatic zone:
Tropical
MY LAST SEEN PROJECTS
PROJECT DESCRIPTION
General Description:
Taekwang (TK) Green Office project is located in the suburban area, addressed at Dusun Belendung II, Rt. 17, Rw. 06 Cibogo in the District of Subang, West Java, Indonesia. TK Green Office project is a part of PT. Taekwang Industrial Indonesia (TKII) shoe factory development. Activities of this project is to build an office building and its supporting facilities, such as roads, parking spaces, landscapes, etc. TK Green Office building will serve as the main office of TKII shoe factory. The owner has decided to pursue USGBC's LEED green building certification for TK Green Office project only, not whole of factory development project.
AWARDS
LEED Silver
SUSTAINABILITY FEATURES
Natural ventilation
Rainwater harvesting
Water-saving sanitary appliances
Recycled materials
Low-emitting materials and finishes
Landscaped areas with no irrigation
Regional materials
Green or brown roofs
Daylighting maximised
Outdoor view maximised
SUSTAINABILITY STRATEGY
Creating a sustainable project
The overall sustainability strategy was mainly comes from selecting the appropriate site. This project was built on a previously developed area, thus the alternative transportation credits can be easily achieved. Another strategy performed was to fulfill the site development and stormwater design credit requirements. On the water efficiency category, selection of water efficient fixtures contribute to a much lower water consumption, by planting native and adapted vegetation also reduces the need for irrigating the landscape. Optimization of the energy performance, leading to energy savings for the building once in use. Selection of the right materials and resources can contribute to a more healthy working environment whilst also divert more waste going into the landfills.
ENERGY DATA
Energy consumption:
33.90 KBtu/ft² (106.941 KW/m²)
Consumption type:
Simulated
Annual carbon footprint:
N/A (N/A )
Climate zone:
Tropical
Min. temperature =
23
Max temperature =
33
RH =
72.5
CLIENT
Client:
Taekwang Group
DESIGNERS
Architect:
Architect:
PT. Indonesia Environment Consultant
CONSULTANTS
Green certification consultant:
PT. Indonesia Environment Consultant
CONTRACTORS
Contractor:
Samwhan Corporation
OTHER PROJECTS BY TEAM
Bekasi, West Java, Indonesia | 2012
Karawang Regency, West Java, Indonesia | 2016
SIMILAR PROJECTS
Avenida República do Chile - Centro, Rio - Rio de Janeiro, Brazil | 2013
Via Filippo Turati, 25, 20121 Milano, Italia | 2012
Via Energy Park, 20871 Torri Bianche MB, Italy | 2009
Seattle, WA, USA | 2012
Via Umberto Forti, 1, 56121 Montacchiello PI, Italia | 2016
Via Chiese, 72, 20126 Milano MI, Italia | 2018
Viale della Liberazione, 20124 Milano MI, Italia | 2017
Via Bernina, 12, 20159 Milano MI, Italia | 2012
New Cairo City, Cairo Governorate, Egypt | 2016
Parma, Province of Parma, Italy | 2018
Manhattan, New York, NY, USA | 2016
Via Fabio Filzi, 29, 20124 Milano MI, Italia | 2015
Piazza Tommaso Edison, 20123 Milano MI, Italia | 2017