PROJECT INFO

Building type:

Industry

Year:

2012

Project Status:

Built

Gross Area:

742043 Sqft

Certificates:

LEED v3 BD+C (New Construction) Silver

Climatic zone:

Tropical

MY LAST SEEN PROJECTS

IMAGES
Thumbnail L'Oreal Jababeka Plant / 160
Thumbnail L'Oreal Jababeka Plant / 161
Thumbnail L'Oreal Jababeka Plant / 162
Thumbnail L'Oreal Jababeka Plant / 163
Thumbnail L'Oreal Jababeka Plant / 164

PROJECT DESCRIPTION

General Description
The L'Oreal project is located in the Jababeka Industrial Estate in Cikarang near Jakarta, Indonesia. It consists of one large building block with three wings, which includes office, production and warehouse functions. One of the wings is an existing building which is renovated. On the site, there are some other small buildings like utility buildings, guardhouses, and a prayer house.

Process for LEED certification application
The process started in the early design stages, where a set of design criteria were agreed with the client and the design team in order to achieve L'Oreal's green building goals. Necessary actions and action holders were identified, and progress per targeted credit was continuously tracked by the LEED team. In case of questions from the design team, the LEED team acted as a helpdesk in order to advise on design choices, materials selection etc. Halfway design a mid-design workshop was arranged, where the status of the design was reviewed and further actions were defined.

AWARDS

LEED Silver

SUSTAINABILITY FEATURES

Water-saving sanitary appliances

Recycled materials

Low-emitting materials and finishes

High efficient lighting

Occupancy sensors

Innovative wastewater systems

Waste reduction commitment

SUSTAINABILITY STRATEGY

Creating a sustainable project
The intent of every LEED credit is to establish a (more) sustainable building. Therefore, aiming at LEED certification in itself constitutes an effort, both by the client and the design and LEED teams, to establish a sustainable project. Specific examples include the selection of a high SRI-roof coating, minimization of the heat island effect by covering all parking places and creating green areas with native plants; selection of water efficient fixtures, contributing to a much lower water consumption; and optimization of the energy performance, leading to energy savings for the building once in use.

ENERGY DATA

Energy consumption:

51.71 KBtu/ft² (163.124 KW/m²)

Consumption type:

Simulated

Annual carbon footprint:

N/A (N/A )

Climate zone:

Tropical

Min. temperature =

23

Max temperature =

33

RH =

72.5

Tropical

No product info available

CLIENT

Client:

L'Oreal Group

DESIGNERS

Architect:

PT. Haskoning Indonesia

CONSULTANTS

CONTRACTORS

Contractor:

PT. Balfour Beatty Sakti Indonesia

Sub contractor:

PT. Karya Intertek Kencana , PT. Batara Mega Krida Kencana

OTHER PROJECTS BY TEAM

Thumbnail Taekwang Green Office

Subang, West Java, Indonesia | 2014

Taekwang Green Office

PT. Indonesia Environment Consultant

Offices | LEED v3 BD+C (New Construction)

Thumbnail P&G SDC Karawang

Karawang Regency, West Java, Indonesia | 2016

P&G SDC Karawang

Arcadis | PT. Indonesia Environment Consultant

Industry | LEED v3 BD+C (New Construction)

SIMILAR PROJECTS

Thumbnail BFI Master Film Store

Gaydon, Warwick, Warwickshire CV35, UK | 2012

BFI Master Film Store

Cullinan Studio

Industry | BREEAM 2008 UK Industrial

Thumbnail P&G SDC Karawang

Karawang Regency, West Java, Indonesia | 2016

P&G SDC Karawang

Arcadis | PT. Indonesia Environment Consultant