NORTEC raised floor - Lindner Group KG
Lindner Group KG
PROJECT INFO
Building type:
Offices
Year:
2018
Project Status:
Built
Gross Area:
20000 Sqm
Certificates:
LEED v3 BD+C (NC) Italia Platinum
Climatic zone:
Temperate
PRODUCTS
NORTEC raised floor - Lindner Group KG
Lindner Group KG
MY LAST SEEN PROJECTS
PROJECT DESCRIPTION
GREEN LIFE
Maximum green space and minimum building footprint to extend the Cavagnari Headquarters; the Green Heart. A project that is sustainable from an energy, social and financial standpoint, and an expression of growing entrepreneurial and environmental awareness.
New volumes, generated from the geometry of the original settlement, are placed along the area’s perimeter in order to define and leave a large green space free in the centre. Green is not used just for landscape and environment value, but as summer micro-climates generator too.
An architecture that is born from the context, with its character and personality, expression of a city, of a society and a history: an intervention with the minimum ecological footprint, socially and economically reasonable, the expression of a new consciousness and entrepreneurial environment.
The complex is composed by the two volumes of the so-called Eco-Uffici, connected between themselves and distributed through the Forum which has the function of reception, dining and meeting point. The Forum is underground, situated beneath a green hill. Each building is designed to be independent in terms of systems and with direct entrance from the street.
Bioclimatic buildings applying the energy strategy “minimum, simple and green”.
Constuctive choices are related to local climatic conditions, aiming to maximize energy efficiency, reduce maintenance and using durable and recyclable materials.
Compact volumes to reduce losses, placed along north-south heliothermic axis to maximize passive solar gains. The Eco-Uffici south facades are fully glazed and protected by a modular shading, while the north facades have reduced windows and outside high-performance walls.
Office buildings proposal is developed with a linear plan having a sleeve of 20m, in order to reduce distribution spaces and paths, maximisation the operating surfaces. In general on the south side are planned open-space offices, while on the north side closed offices; in the middle there are lifts, meeting rooms and other services, all overlooking an empty double, triple and quadruple height courtyard, with an interior garden and pond, made to encourage natural ventilation in spring and autumn.
AWARDS
TROPHEE HORIZON 2013 INNOVATION DURABLE
LEED PLATINUM Certification
SUSTAINABILITY FEATURES
Natural ventilation
Innovative cooling system
Shading system
Photovoltaics
Grey Water Recycling
Biological water treatment
Water-saving sanitary appliances
Sustainable building materials
Low-emitting materials and finishes
High efficient lighting
Daylight sensors
Environmentally friendly furniture
Smart design (passive design strategies)
On-site renewables
Ground Source Heat Pump
Green or brown roofs
Outdoor view maximised
Sustainable transport
Waste reduction commitment
Recycling facilities provided
SUSTAINABILITY STRATEGY
Green Life is an eco-sustainable headquarter both for the external environment of nature and for the internal ‘human’ one of a Company made up of people and shared values, expression of the new ‘smart and green’ approach with which Crédit-Agricole has renewed its brand identity.
At the climatic level, the strategy adopted was to maximize passive energy aspects to minimize active energy supplies, and for the energy required to use renewable sources: ‘energy saving’ also intended as a contribution to environmental improvement.
Radiant ceiling panels integrated with air changes on the perimeter, natural ventilation in the mid-seasons and night-time ‘free cooling’: for the various interiors the project introduces the concept of ‘sensory comfort’, that is the optimisation of the quality of the spaces in thermal, acoustic and lighting engineering terms.
The complex is powered by a geothermal plant of 800 KW and a photovoltaic system of 428 KW, with an estimated energy saving for the entire Management Center of over 16%.
The complex was awarded LEED Platinum from the U.S. Green Building Council.
LEED Voluntary certification program, LEED® promotes a sustainability-oriented approach, recognizing the performance of buildings in terms of energy savings and water resources, reduction of carbon dioxide emissions, quality of indoor environments in terms of user welfare. Furthermore, one of the certification milestones is the choice of eco-friendly materials and resources used, or the site and its connection with the city, as well as considering the management and maintenance of buildings over time.
ENERGY DATA
Energy consumption:
85.00 KW/m² (26.945 KBtu/ft²)
Consumption type:
Simulated
Annual carbon footprint:
N/A (N/A )
Climate zone:
Temperate
Min. temperature =
N/A
Max temperature =
N/A
RH =
N/A
NORTEC raised floor - Lindner Group KG
Lindner Group KG
CLIENT
Client:
Crédit Agricole Italia
DESIGNERS
Architect:
Architect:
FRIGERIO DESIGN GROUP , Enrico Frigerio , Daniele Bona , Carola Ginocchio , Anna Tsareva , Federico Biassoni , Monica Russotto , Paula Vier , Daniela Galletti , Fabio Valido , Carola Ginocchio , Politecnica Ingegneria e Architettura
CONSULTANTS
:
VERDE PROGETTO E DIREZIONE ARTISTICA PARCO ARBORETUM , AG&P greenscape , E.Bortolotti , P.Villa , P.Palmulli , A.Battaglia , M.Troisi , I.Marchesin , B.Frangi , A.Parigi , P.Tagliola , A.Bortolotti , GEOLOGIA E GEOTECNICA , EN GEO Engineering Geology , C. Caleffi , INGEGNERIA IDRAULICA , R. Telò , DIREZIONE LAVORI , G. Burchi , M. Borsa , G. Borrini , RESPONSABILE LAVORI , Borrini Ingg. Associati , P. Castagnetti
Acoustical consultant:
Materiacustica , A. Farnetani , N. Prodi , AIDA , A. Farina , E. Armelloni
Building services engineer:
Politecnica ingegneria e architettura , M. Gusso , Massimo Fiorini , Francesco Frassineti
Development manager:
Giulio Burchi , Frigerio Design Group srl
Green certification consultant:
Specialist consultant:
Borrini Ingg. associati , AG&P Greenscape srl , EN GEO , Carlo Caleffi
Structural Engineer:
Policreo , Pier Paolo Corchia , L. Ferrari , L. Provenzale , A. Troni , R. Bizzi , APE , Mauro Ferrari
CONTRACTORS
Contractor:
Pizzarotti & C. , Unieco Soc. Coop.
OTHER PROJECTS BY TEAM
SIMILAR PROJECTS
Avenida República do Chile - Centro, Rio - Rio de Janeiro, Brazil | 2013
Via Filippo Turati, 25, 20121 Milano, Italia | 2012
Via Energy Park, 20871 Torri Bianche MB, Italy | 2009
Seattle, WA, USA | 2012
Via Umberto Forti, 1, 56121 Montacchiello PI, Italia | 2016
Via Chiese, 72, 20126 Milano MI, Italia | 2018
Viale della Liberazione, 20124 Milano MI, Italia | 2017
Via Bernina, 12, 20159 Milano MI, Italia | 2012
New Cairo City, Cairo Governorate, Egypt | 2016
Manhattan, New York, NY, USA | 2016
Via Fabio Filzi, 29, 20124 Milano MI, Italia | 2015
Piazza Tommaso Edison, 20123 Milano MI, Italia | 2017