PROJECT INFO

Building type:

Offices

Year:

2015

Project Status:

Built

Gross Area:

10000 Sqm

Certificates:

LEED v3 BD+C (Core & Shell) Platinum

Climatic zone:

Temperate

MY LAST SEEN PROJECTS

IMAGES
Thumbnail VIA FABIO FILZI OFFICES / 0
Thumbnail VIA FABIO FILZI OFFICES / 1
Thumbnail VIA FABIO FILZI OFFICES / 2
Thumbnail VIA FABIO FILZI OFFICES / 3
Thumbnail VIA FABIO FILZI OFFICES / 4
Thumbnail VIA FABIO FILZI OFFICES / 5
Thumbnail VIA FABIO FILZI OFFICES / 6
Thumbnail VIA FABIO FILZI OFFICES / 7

PROJECT DESCRIPTION

The building in via Fabio Filzi, on the corner with via Galvani, was built in the ‘30s by A.F.L. Falck. The compositional typologies are typical of the architecture in Milan between the two wars, the characteristic element being the articulated volume in exposed brick, dominated by the clock tower. Headquarters for Siemens first and then for Regione Lombardia’s Council, Filzi 29 was undergone a radical restoration intervention. The result is a completely new building, designed according to the latest manufacturing and installations techniques and with high quality finishes, in line with current international standards.

The building awarded the prestigious LEED certification from U.S. Green Building Council, achieving the highest PLATINUM level and totalizing the amazing score of 87 points. It’s the first building in Italy to be certified under the standard LEED Core&Shell v.3, with such a high score. Its green vocation is evident in the thermal insulation of its facade, in conditioning with high-efficiency pumps for ground water heat recovery and in the automated management of natural light and low consumption artificial LED lighting.

AWARDS

SUSTAINABILITY FEATURES

Shading system

High efficient façade

Photovoltaics

Water-saving sanitary appliances

Low-emitting materials and finishes

High efficient lighting

Occupancy sensors

Ground Source Heat Pump

Regional materials

Sustainable transport

SUSTAINABILITY STRATEGY

This project represents an important example of an existing building renovation by applying the key concepts of energy efficiency and sustainability. Therefore, building services are designed to achieve significant optimizations in terms of energy consumption by adopting the following strategies:
- two energy raiser units capable of delivering simultaneously hot and chilled water by heat exchange with a geothermal renewable source (groundwater). This allows greater efficiency in any season of operation with low investment costs and with relevant energy cost savings compared to the traditional solutions.
- high efficiency heat recovery (both sensible and latent) on exhaust air is provided to preheat or precool fresh air by means of thermal wheel air-to-air recuperator.
- Chilled water supply to air handling units (AHU) and fan coil units are adapted to instantaneous thermal loads by means of Variable Speed Drives (VSD) as pump motors control, thus drastically reducing power consumption during operation.
- Groundwater guarantees fresh air pre-cooling in hot season.
- The toilet w.c. flushing is fed by a second non-potable network supplied by rainwater harvesting or, during dry periods, by groundwater (after heat exchange with energy raisers). Water efficiency is also increased by the use of low-flow sanitary fixtures like high efficiency dual flush toilet, aerators on mixing taps, electronic controls.
- Renewable Sources are represented by a geothermal source for HVAC system and a photovoltaic system on roof.
- Building Management System (BMS) has been installed that includes an automatic control of all building plants, space planning flexibility in case of office layout changes, an integrated control strategy for occupants thermal and bright comfort (including control of artificial lighting in coordination with natural light and motorized solar screens), safety and security systems integration, real-time monitoring of equipment status and efficiency, ensuring also a maintenance time scheduling and an energy consumption reports to allow continuous commissioning actions during all building life cycle (eg. load profiles analysis for energy optimization)
- Passive systems like existing windows replacement, insulating materials addition on walls and roof and adjustable sunscreens on glass facades has also been adopted to increase the efficiency of the building.

ENERGY DATA

Energy consumption:

203.00 KW/m² (64.351 KBtu/ft²)

Consumption type:

Simulated

Annual carbon footprint:

93.00 KgCO2m² (1001.044 KgCO2/ft²)

Climate zone:

Temperate

Min. temperature =

N/A

Max temperature =

N/A

RH =

N/A

Temperate

No product info available

CLIENT

Client:

Fabio Filzi s.r.l.

DESIGNERS

Architect:

Asti Architetti

Architect:

Asti Architetti

CONSULTANTS

Building services engineer:

Tekser Srl , BR di Brambilla Roberto

Building surveyor:

Studio Archemi

Green certification consultant:

Tekser Srl

Manager:

Studio Archemi

Structural Engineer:

St. Brambilla Ferrari s.r.l.

Sustainability consultant:

Tekser Srl

CONTRACTORS

OTHER PROJECTS BY TEAM

Thumbnail CANTU’ - OREFICI BUILDINGS

Via Cesare Cantù, 2, 20123 Milano MI, Italia | 2019

CANTU’ - OREFICI BUILDINGS

Studio Barreca & La Varra | Tekser

Mixed-Use | LEED v4 BD+C (Core & Shell) | LEED v4 BD+C (Core & Shell)

SIMILAR PROJECTS

Thumbnail Taekwang Green Office

Subang, West Java, Indonesia | 2014

Taekwang Green Office

PT. Indonesia Environment Consultant

Offices | LEED v3 BD+C (New Construction)

Thumbnail TNT Centre

Hoofddorp, The Netherlands | 2011

TNT Centre

Paul De Ruiter Architects | Paul de Ruiter Architects

Offices | LEED v2.2 NC

Thumbnail VeluxLab

Milan, Italy | 2013

VeluxLab

ATelier2

Offices

Thumbnail La Serenissima Office Building

Via Filippo Turati, 25, 20121 Milano, Italia | 2012

La Serenissima Office Building

Park Associati (Filippo Pagliani, Michele Rossi) | Park Associati

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail Energy Park - Building 03

Via Energy Park, 20871 Torri Bianche MB, Italy | 2009

Energy Park - Building 03

Garretti Associati | Garretti Associati Srl

Offices | LEED v2.0 CS

Thumbnail Bullitt Center

Seattle, WA, USA | 2012

Bullitt Center

The Miller Hull Partnership | Bullitt Center Foundation

Offices

Thumbnail Ardeko

Boulogne-Billancourt, France | 2013

Ardeko

Baumschlager Eberle

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail Isozaki Tower

Milano, Italia | 2013

Isozaki Tower

Arata Isozaki and Andrea Maffei | Manens-Tifs

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail IBN Institute

Wageningen, The Netherlands | 1998

IBN Institute

Behnisch Architekten

Offices

Thumbnail Genzyme Center

Cambridge, MA, USA | 2004

Genzyme Center

Behnisch Architekten

Offices | LEED v2.2 NC

Thumbnail Foundry

London N1 7RU, UK | 2012

Foundry

Cullinan Studio

Offices | BREEAM 2008 UK Offices

Thumbnail One Angel Square

Manchester, Manchester, UK | 2012

One Angel Square

3DReid

Offices | BREEAM 2008 UK Offices

Thumbnail Brussels Environment

Brussels, Belgium | 2014

Brussels Environment

cepezed architects

Offices | BREEAM International New Construction 2013

Thumbnail Pearl River Tower

Guangzhou, Guangdong, China | 2013

Pearl River Tower

Skidmore, Owings & Merrill LLP

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail Geelen Counterflow

6081 Haelen, Netherlands | 2015

Geelen Counterflow

ARCHION . | ARCHION

Offices | BREEAM New Construction 2011 (UK)

Thumbnail 1200 Intrepid

Philadelphia, PA, USA | 2016

1200 Intrepid

BIG Bjarke Ingels Group

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail Goito58

Rome, Italy | 2012

Goito58

Chapman Taylor

Offices | LEED v3 BD+C (Core & Shell) | BREEAM 2015 International In-Use

Thumbnail One Carter Lane

1 Carter Ln, London EC4V 5ER, UK | 2015

One Carter Lane

Studio Ben Allen | Cundall .

Offices | BREEAM 2014 UK Refurbishment and Fit-Out | ITACA New and Existing Interiors v1

Thumbnail

Via Umberto Forti, 1, 56121 Montacchiello PI, Italia | 2016

"Umberto Forti" Headquarters

ATIproject S.r.l.

Offices | LEED v4 BD+C (New Construction)

Thumbnail Prysmian HQ

Milan, Metropolitan City of Milan, Italy | 2017

Prysmian HQ

Maurizio Varratta Architects | DEGW .

Offices | LEED v3 BD+C (New Construction)

Thumbnail Engie Headquarters

Via Chiese, 72, 20126 Milano MI, Italia | 2018

Engie Headquarters

Park Associati (Filippo Pagliani, Michele Rossi) | Park Associati

Offices | LEED v4 BD+C (Core & Shell)

Thumbnail Diamond Tower - Porta Nuova Varesine

Viale della Liberazione, 20124 Milano MI, Italia | 2017

Diamond Tower - Porta Nuova Varesine

Proger s.p.a | GreeningLab Specialist in Green Building

Offices | LEED v3 ID+C (Commercial Interiors)

Thumbnail Edificio Uffici - Bernina

Via Bernina, 12, 20159 Milano MI, Italia | 2012

Edificio Uffici - Bernina

RED s.c.r.l. | GreeningLab Specialist in Green Building

Offices | LEED v3 BD+C (Core & Shell)

Thumbnail NOI Techpark

Via Alessandro Volta, 13, 39100 Bolzano BZ, Italia | 2017

NOI Techpark

Chapman Taylor

Offices | LEED v4 ND (Neighborhood Development)