PROJECT INFO

Building type:

Mixed-Use

Year:

2016

Project Status:

Built

Gross Area:

23000 Sqm

Certificates:

BREEAM 2009 International NC: Offices Outstanding

 | 

BREEAM 2009 International NC: Retail Excellent

Climatic zone:

Continental

MY LAST SEEN PROJECTS

IMAGES
Thumbnail Torsplan 2 / 0
Thumbnail Torsplan 2 / 0 © NCC
Thumbnail Torsplan 2 / 0 © NCC
Thumbnail Torsplan 2 / 0 © NCC
Thumbnail Torsplan 2 / 0 © BAU Architects
Thumbnail Torsplan 2 / 0 © NCC
Thumbnail Torsplan 2 / 0 © NCC
Thumbnail Torsplan 2 / 0 © BAU Architects
Thumbnail Torsplan 2 / 0 © BAU Architects
Thumbnail Torsplan 2 / 0 © BAU Architects
Thumbnail Torsplan 2 / 0 © BAU Architects
Thumbnail Torsplan 2 / 0 © NCC

PROJECT DESCRIPTION

Torsplan phase 2 is a commercial property consisting of office and retail space with both of these functions certified according to the BREEAM environmental certification scheme. The office portion of the project has achieved BREEAM level Outstanding and the retail portion the level of Excellent. The project is a partnership between developer, head contractor and building services contractors. The ground floor is intended for retail use with the remaining nine floors allocated for offices. In total, the project has a lettable area of approximately 23,000 m² (of which 3,500 m² is retail) as well as an underground garage with 164 parking spaces.

Torsplan phase 2 is centrally located in Stockholm in the new city district Hagastaden. This new district was previously an industrial area and NCC has been the first company to complete buildings within the area. When Hagastaden is completed, the area will be one of the most prominent clusters for Life Science technology in the world. As a complement to the commercial space, the area will also offer housing and green space. Together, the combination of these functions will eventually create a vibrant downtown district. The Torsplan phase 2 building plays an important role in the area as its retail premises complement the area’s office space with strategic services such as a gym, a grocery store, restaurants and a garage.

Despite being a developer and not a long-term owner on the Torsplan phase 2 project, NCC chose BREEAM for certification of the project as BREEAM is the most demanding, diverse and challenging environmental assessment method available. All of NCC’s development projects are certified according to BREEAM and Torsplan phase 2 is, at the moment, the company's flagship. The first building in Hagastaden, Torsplan phase 1, was certified to BREEAM Excellent. This high level of achievement was made possible by the unique form of partnership between the stakeholders and using the experience gained from phase 1 the phase 2 project was used to further develop the partnering concept. For phase 2, a more structured approach to sustainability was adopted at every project stage. Along the way, the BREEAM certification became the tool for deepening the level of cooperation between the partners and the application of BREEAM has proved that NCC is able to attain a very high standard of environmental, social and financial sustainability.

The high level BREEAM certification has attracted conscientious tenants who want to contribute to a more sustainable society and at the same time realize lower operating costs. NCC started the project without tenants and investors, i.e. entirely on speculation. A prerequisite for the initiative has been the appeal of the ambitious BREEAM certification.

AWARDS

BREEAM Award Commercial 2016

Shortlisted for BREEAM Award Office 2016

Sustainability Award at the Swedish Concrete Gala 2016

SUSTAINABILITY FEATURES

Ventilation + Heat recovery

High efficient façade

District heating scheme

Water-saving sanitary appliances

Sustainable building materials

Low-emitting materials and finishes

High efficient lighting

Occupancy sensors

Environmentally friendly furniture

Green or brown roofs

Daylighting maximised

Electrical charging point for cars

Outdoor view maximised

Sustainable transport

Waste reduction commitment

SUSTAINABILITY STRATEGY

The work with BREEAM spans the entire project: from the early stages through design, from production to inspection and finally to the delivery of the finished building. The environmental certification has from early in the process led to increased consideration on a variety of decisions and system options hereby giving a better and more thought-out final product. BREEAM has become part of a common vision within the partnering work and has become a quality assurance throughout the project. It has also contributed to an increased commitment between the partners where good environmental ideas are taken all the way from the drawing board to the finished building without being compromised or forgotten along the way.

The building has a heavy concrete structure providing good thermal storage capability which in turn reduces the building’s energy use and reduces the power supplier’s peak loads. The heavy structure also mitigates temperature variation throughout the day giving a more comfortable indoor climate. Energy use is further reduced with efficient LED lighting. The building is heated by district heating which produces lower emissions of greenhouse gases compared to other equivalent means of heating. In another innovative solution, the heating of the garage is by means of extract air from the office and retail parts of the project, resulting in less need for district heating.

Material for the building is chosen with great care and to minimize the amount used it has been constructed with a prefabricated frame and facade along with a high performance insulation. Exposed parts of the building are protected to reduce the need for maintenance and interior partition systems are used to easily allow for adaptation of the building in the future. In the early stage, the project team established contact with a building materials supplier who created a special inventory for the project. Through a collaborative effort, the project could ensure that all timber purchased was FSC- or PEFC-certified throughout the entire supply chain. This applies both for the wood used in the construction process and for built-in materials. During the purchasing of other materials, suppliers were assessed and products that were responsibly manufactured and sourced were preferred.

During the construction process, the project used green electricity to power energy-efficient CTX-office cabins as well as fuel-efficient vehicles, tools and machines. Great focus has also been put into the recycling of construction waste. The project recycled all but one of key waste groups and in doing so greatly limited the amount of material which was sent to the landfill. In addition, a waste compactor is to be installed to minimize waste shipments from the building and the project offers a refrigerated room where waste for composting/anaerobic digestion is to be stored until delivery. The waste generated by each of the tenants is weighed and catalogued and tenants are charged based on the weight of the materials they produce.

On the roof terrace of the building, a sedum green roof contributes to a more comfortable microclimate. The green roof also helps to reduce local surface water runoff and reduce load on the storm water system during heavy rainfall. The sedum roof will be sown on site to maximize biodiversity. The roof also has a running track and an outdoor gym.

Charging stations for electric cars will be installed in the garage and the elevators are equipped with regenerative elevator drives which regenerate electricity as they are used. Toilets and showers are equipped with low-flow faucets. Water is metered so as to monitor use in the respective premises.

The project achieved a high number of credits through the promotion of sustainable modes of transport. The building offers 200 bicycle parking spaces in a preferred location (indoors at ground level) and the option of having changing facilities and showers within each of the tenant's premises. Building users who do not cycle to work can easily travel to the building by metro, commuter train and/or bus. Eventually a new metro station will be built under the building, with direct access into Torsplan phase 2.

Achieving BREEAM Outstanding is a challenge in Sweden. This is partly because of the country’s cold climate but also because of the already stringent demands of the Swedish Building Code (BBR) with regards to energy. To achieve better results than national best practice requires smart system selection, good planning and innovative solutions. Energy calculations show that the building will achieve lower energy use than the national best practice. Sweden also has very stringent regulations for noise reduction. Torsplan phase 2 is located near the most heavily trafficked highway in Sweden. As such, provision of a good acoustic environment within the building proved to be a particular challenge.

In order to achieve the BREEAM certification, demands are also placed upon future tenants. These demands are represented in the leasing agreements and have an impact on the resource efficiency of their businesses. For example, through more efficient showers which reduce water usage. Another example is that, within the offices, future tenants will have integrated staff areas within their facilities to improve the working environment for their employees.

ENERGY DATA

Energy consumption:

50.00 KW/m² (15.850 KBtu/ft²)

Consumption type:

Simulated

Annual carbon footprint:

N/A (N/A )

Climate zone:

Continental

Min. temperature =

N/A

Max temperature =

N/A

RH =

N/A

Continental

No product info available

CLIENT

Client:

NCC Property Development

DESIGNERS

Architect:

BAU Architects

Architect:

BAU Architects

CONSULTANTS

Building services engineer:

Tjuren , Electro Engineering

Energy consultant:

NCC THU AB

Green certification consultant:

IVL Svenska Miljöinstitutet AB

Structural Engineer:

Tyréns , Hill statik , ELU

CONTRACTORS

Contractor:

NCC Property Development

OTHER PROJECTS BY TEAM

No other project by team

SIMILAR PROJECTS

Thumbnail Orona Ideo

Hernani, Gipuzkoa, Spain | 2014

Orona Ideo

Xabier Barrutieta

Mixed-Use | BREEAM ES | LEED v3 BD+C (New Construction)

Thumbnail Trentino Trasporti

38027 Croviana TN, Italia | 2015

Trentino Trasporti

Studio Decaminada | Manens-Tifs

Mixed-Use | LEED v3 BD+C (New Construction)

Thumbnail Zuellig Building

Manila, Metro Manila, Philippines | 2012

Zuellig Building

Skidmore, Owings & Merrill LLP

Mixed-Use | LEED v2.0 CS

Thumbnail Alpine Place

London Borough of Brent, UK | 2015

Alpine Place

Ayre Chamberlain Gaunt

Mixed-Use | BREEAM New Construction 2014 (UK)

Thumbnail CANTU’ - OREFICI BUILDINGS

Via Cesare Cantù, 2, 20123 Milano MI, Italia | 2019

CANTU’ - OREFICI BUILDINGS

Studio Barreca & La Varra | Tekser

Mixed-Use | LEED v4 BD+C (Core & Shell) | LEED v4 BD+C (Core & Shell)

Thumbnail World Food Programme Headquarter

Via Cesare Giulio Viola, 68, 00148 Roma RM, Italia | 2015

World Food Programme Headquarter

Aka Architetti | GreeningLab Specialist in Green Building

Mixed-Use | LEED v3 ID+C (Commercial Interiors) | LEED v3 BD+C (New Construction)

Thumbnail Ghella Meeting Center

Via Pietro Borsieri, 2a, 00195 Roma RM, Italia | 2018

Ghella Meeting Center

SpainiAA | SINERGI Consulting llc

Mixed-Use | LEED v4 BD+C (New Construction)